Kashigaon
19.27769, 72.88016 (MMRDA's alignment file, Mar 2025)
Choose a station on the map or in the list.
Street level
The street view for the chosen station appears here.
Mumbai Metro, Dahisar (E) to Mira-Bhayandar. The unofficial tracker.
All linesEdition of Facts checked Not affiliated with MMRDA
Four stations are open, from Dahisar (E) to Kashigaon, and trains run through from Line 7. The other four, from Kashigaon to Bhayandar, are nearly built: on 31 Aug 2026, MMRDA put U-girder erection at 98 per cent. 8 stations in all.
VerifiedMMRDA (opens source in a new tab)
Ride the lineThe opening date, train times, how often trains run and what a ticket costs. Each fact shows once MMRDA or a news source gives it, with its source.
Open since 7 Apr 2026. VerifiedMMRDA (opens source in a new tab)
MMRDA: 'Phase I of Line 9 (Dahisar (E) to Kashigaon, 4.7 km with 4 stations): Operational from 07-April-2026.' Inaugurated that day by the Chief Minister; open to riders from 8 Apr (Free Press Journal).
Not open yet. No opening date announced. Reported target: December 2026. ReportedConstruction World (opens source in a new tab)
Eight stations, Dahisar (E) to Subhash Chandra Bose Stadium. Scroll to ride the line station by station. Distances follow MMRDA's alignment file of March 2025, from Dahisar (E).
Station 1 of 8
0.00 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Change for Metro Line 7 (Dahisar (E)-Andheri (E)),Metro Line 2A (Dahisar-D N Nagar)ReportedFree Press Journal (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 2 of 8
1.80 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 3 of 8
2.72 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 4 of 8
3.61 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 5 of 8
4.83 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 6 of 8
6.45 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 7 of 8
7.62 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 8 of 8
8.26 km from the start of the line at Dahisar (E) VerifiedMMRDA (opens source in a new tab)
Under construction Verified
A solid line marks track open to riders, Dahisar (E) to Kashigaon; a hollow line marks track under construction.
The line on a street map. Choose a station to see where it sits, what surrounds it and what the street looks like today. The route and stations come from MMRDA's alignment file of March 2025.
Open to riders, Dahisar (E) to Kashigaon
Under construction, Kashigaon to Subhash Chandra Bose Stadium. Route from MMRDA's alignment fileVerifiedMMRDA (opens source in a new tab)
19.27769, 72.88016 (MMRDA's alignment file, Mar 2025)
Choose a station on the map or in the list.
The street view for the chosen station appears here.
Station data last reviewed 10 Nov 2026.
The same spots from above, before construction began in September 2019 and in the latest imagery. Drag the handle or use the arrow keys to compare.
The latest image is Esri's newest of this area, captured . The site checks for newer imagery every month; last checked .
A drone flight along Phase 2, from Kashigaon to Subhash Chandra Bose Stadium, by InfraUnfiltered, published . Shared with permission. Pick a station to start the video where the flight reaches it.
The video loads from YouTube only when you press play.
The line in figures. Old figures stay on the page, struck through, so you can see how the project changed.
MMRDA publishes a progress table for Line 9 by part of the work (viaduct, stations, flyover). The site shows the items that are not yet complete and one finished item from each part.
Every package we could trace, with its value in crore rupees. MMRDA keeps only current notices online, so most of these come from trade press.
| Package | Scope | Floated | Estimate | Awarded | Awarded to | Status | Source |
|---|---|---|---|---|---|---|---|
| CA-48 | Viaduct, ramps, stations and flyovers of Line 9, and the tunnels and underground station of 7A | Not found | Not published | ₹1,998 cr13 Sep 2019 | J Kumar Infraprojects | Awarded | Reportedbusiness-standard.com (opens source in a new tab) |
| CA-167 | Ballastless track from Dahisar (E) to Bhayandar, with a third track, a siding and a dead end at Dahisar | Apr 2023 | ₹88.28 cr | Not yet | Rahee Infratech | Bids opened | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-176 | Power: 33 kV and 25 kV cabling, overhead wire with switching station, auxiliary power, SCADA, for Lines 9 and 7A | Not found | ₹108.01 cr | Not publishedJun 2025 | Leena Powertech-Umesh Brothers JV | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-207 | Dongri depot for the Red Line (Lines 9, 7 and 7A): land development, stabling yard, control centres, workshops | Feb 2024 | ₹639.58 cr | ₹701.94 cr8 Aug 2024 | Rithwik Projects-Soma Enterprise JV | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
Line 9 runs as one service with Line 7: BEML-built trains go through from Gundavali to Kashigaon. They are of the fleet MMRDA ordered from BEML in 2018 for Lines 2A, 2B and 7. No source gives how many of them run on Line 9, or which of the orders they came from.

BEMLVerifiedpib.gov.in (opens source in a new tab)
The 2018 order, package MRS1, ₹3,015 crore: 63 trains of 6 cars (378 coaches), built at Bengaluru. Verifiedpib.gov.in (opens source in a new tab)
On Line 9: The trains run through from Gundavali on Line 7 to Kashigaon, and are kept at Charkop, Line 7's depot. MMRDA has since dropped the Dongri depot, so Charkop is to stay their depot (Free Press Journal, 11 Nov 2026). ReportedFree Press Journal (opens source in a new tab)
Trials: The Research Designs and Standards Organisation's speed and brake trials of BEML trains on Line 9 reached 90 km/h (September 2025). ReportedMetro Rail Today (opens source in a new tab)
Designed for: Driverless running, regenerative braking, CCTV for riders and for watching the track ahead, full air conditioning. Verifiedpib.gov.in (opens source in a new tab)
The maker's description: Six-car trains for unattended train operation (UTO), with a train control and management system (TCMS), built to the EN 45545 HL3 fire standard. Verifiedbemlindia.in (opens source in a new tab)
Supply: At the award, supply was to begin in October 2020 and end in December 2022; the cars are built at BEML's factory in Bengaluru, with Hitachi for some designs. Verifiedpib.gov.in (opens source in a new tab)
Later orders: BEML got two more orders under the same contract: 126 cars (21 trains, Rs 834 crore, August 2019) and 72 cars (12 trains, Rs 501 crore, November 2020), for 576 cars, 96 trains, in all. The Metro Rail Guy gives these for Lines 2A and 7. ReportedThe Metro Rail Guy (opens source in a new tab)
MMRDA's figures for Lines 9 and 7A. MMRDA's page lists the car size and an eight-car capacity for Lines 9 and 7A; the trains running now have six cars (reported). VerifiedMMRDA (opens source in a new tab)
All 8, in order from Dahisar (E) to Subhash Chandra Bose Stadium in Bhayandar. Names follow MMRDA. Select a station to ride to it, or open its own page.
Station list and order VerifiedMMRDA (opens source in a new tab) station count VerifiedMMRDA (opens source in a new tab)
Spots between stations that can delay Line 9, like a bridge over a busy road or a building in the way. Readers send these photos.
No watch points on this line yet. Do you know a place that holds up the work? Send a photo of it, choose "Not a station", and say where it is.
New: reader photos
You pass the pillars every day. Send your photos of Line 9, or tell us what changed. A place that holds up the work, like a span over a junction or a building in the way, can become a watch point. We check every entry by hand, blur faces and number plates, and put the photo on its station page with your name.
Send a photo or updateThank you to Arindam Mahapatra on X (opens in a new tab), who suggested this form. His photos of Amandoot were the first reader photos on this site.

The latest reported milestones, each linked to the article or document, posts on X picked by hand, and news that a script finds every six hours.
No posts picked yet.
Posts appear here only after a person has checked them.
Found automatically in the outlets' own feeds, not checked by a person. Last new item found .
From the first report in 2018 to the reported opening target. Dates show only as much precision as the source gives.
Every figure on this page links to where it came from. This is how to read the marks next to them.
The full list, with every news and trade source, is in SOURCES.md.
Tell us what is wrong and where you saw the right figure. We check every correction by hand and fix the page.
Send a correctionSend your photos of Line 9 or what you saw on site. We check every entry by hand and credit you by name.
Send a photo or update