- When did Mumbai Metro Line 9 open?
Phase I, Dahisar (E) to Kashigaon, opened to riders on 7 Apr 2026. The rest of the line has a reported target of December 2026.
VerifiedMMRDA (opens source in a new tab)ReportedConstruction World (opens source in a new tab)
- What are the train times and fares on Line 9?
On Phase I, Dahisar (E) to Kashigaon: Trains run from 5:50 am to 11:00 pm. A train comes every 6 minutes at peak. A single fare costs Rs 10 to Rs 20.
ReportedFree Press Journal (opens source in a new tab)ReportedFree Press Journal (opens source in a new tab)ReportedFree Press Journal (opens source in a new tab)
- Which Line 9 stations are open?
4 of 8: Dahisar (E), Pandurang Wadi, Miragaon and Kashigaon. MMRDA opened Phase I, Dahisar (E) to Kashigaon (4.7 km), on 7 Apr 2026; riders could board from the next day. Trains run through from Gundavali on Line 7, as reported; at the opening a ride cost Rs 10 to Rs 20 on Line 9 and Rs 50 from Gundavali to Kashigaon.
VerifiedMMRDA (opens source in a new tab)ReportedFree Press Journal (opens source in a new tab)
- When will Line 9 reach Bhayandar?
The rest of the line, Kashigaon to Subhash Chandra Bose Stadium (Sai Baba Nagar, Meditiya Nagar, Shahid Bhagat Singh Garden and Subhash Chandra Bose Stadium), is reported for December 2026, after the Commissioner of Metro Rail Safety inspects it. Power was switched on along it from 29 Jul 2026. No day has been announced; the site counts down to the end of December. An earlier report, of August 2026, expected it within two to three months.
ReportedConstruction World (opens source in a new tab)ReportedFree Press Journal (opens source in a new tab)
- How much of Line 9 is built?
Nearly all of it. MMRDA's table for 31 Aug 2026 shows every viaduct item at 100% except U-girder erection (98%), and the station items at 95% to 100%. The double-decker flyover's deck slab is at 95%. News reports of October 2026 put the rest of the line at 96%.
- What is the route of Metro Line 9?
Dahisar (E) to Mira-Bhayandar, extending Line 7 north from Dahisar (E). It is fully elevated. From Dahisar (E), at the north end of Line 7, it runs north through Mira Road to Kashigaon, then west to Bhayandar (W). Near Bhayandar it shares a double-decker viaduct with a road flyover and crosses the Western Railway on a 65 m steel span. Sources give its length as 10.5, 10.41 or 11.38 km; MMRDA gives 13.581 km for Lines 9 and 7A together.
VerifiedMMRDA (opens source in a new tab)Sources conflictFree Press Journal (opens source in a new tab)VerifiedMMRDA (opens source in a new tab)
- Which stations are on Line 9?
8, all elevated, in order from Dahisar (E): Dahisar (E), Pandurang Wadi, Miragaon, Kashigaon, Sai Baba Nagar, Meditiya Nagar, Shahid Bhagat Singh Garden, Subhash Chandra Bose Stadium. MMRDA's alignment file of March 2025 still calls three of them by older names: Amar Palace (Miragaon), Zankar Company (Kashigaon) and Deepak Hospital (Meditiya Nagar).
- Where does Line 9 meet other lines?
At Dahisar (E), with Line 7, which its trains run through to, and Line 2A, as reported. MMRDA names the connections of Lines 9 and 7A together: Western Express Highway, Western Railway, Metro Line 2A (Dahisar-D N Nagar) and Metro Line 7 (Dahisar (E)-Andheri (E)).
- How much does Metro Line 9 cost?
MMRDA gives one cost for Lines 9 and 7A together: Rs 6,607 crore, including state taxes and escalation. No figure for Line 9 alone was found. The civil contract for both lines is reported at Rs 1,998 crore.
VerifiedMMRDA (opens source in a new tab)Reportedbusiness-standard.com (opens source in a new tab)
- Who is building Line 9?
MMRDA. J Kumar Infraprojects builds the viaduct, stations and flyover (package CA-48, 13 Sep 2019, shared with 7A). Rahee Infratech bid lowest for the track (CA-167), Leena Powertech and Umesh Brothers for the power (CA-176, with 7A), and Rithwik-Soma JV won the Dongri depot (CA-207), which MMRDA has since dropped, all as reported.
VerifiedMMRDA (opens source in a new tab)Reportedbusiness-standard.com (opens source in a new tab)ReportedThe Metro Rail Guy (opens source in a new tab)ReportedThe Metro Rail Guy (opens source in a new tab)
- Where is the Line 9 depot?
At Charkop, Line 7's depot, which is to serve Lines 7, 7A and 9 together. In November 2026 MMRDA dropped the separate depot at Dongri, near Uttan (Rs 701.94 crore, awarded 8 Aug 2024); about 12,000 trees there are spared. As reported.
- How many people will use Line 9?
MMRDA projects 11.12 lakh riders a day by 2031 for Lines 9 and 7A together, with up to 30,389 an hour in the busiest direction. It says the lines cut travel time by 50% to 75%, depending on road conditions.
- What else is Metro Line 9 called?
Mumbai Metro Line 9 is also called Metro 9 or the Red Line: MMRDA calls it the extension of Line 7, whose colour is Red. Kashigaon to Subhash Chandra Bose Stadium is called Phase II in the news.
The full Line 9 tracker, with the route, map, tenders and timeline.