Mumbai Metro, D N Nagar to Mandale. The unofficial tracker.
All linesEdition of Facts checked Not affiliated with MMRDA
Six stations are open, from Mandale through Mankhurd to Chembur. The other fourteen, from Chembur through Kurla, BKC and Bandra to D N Nagar, are being built: on 31 Aug 2026, MMRDA put pier work at about 99 per cent and girder work at about 90 per cent. 20 stations in all.
VerifiedMMRDA (opens source in a new tab)
Ride the lineThe opening date, train times, how often trains run and what a ticket costs. Each fact shows once MMRDA or a news source gives it, with its source.
Open since 7 Apr 2026. VerifiedMMRDA (opens source in a new tab)
MMRDA: operational from 7 Apr 2026. Inaugurated that day by the Chief Minister; open to riders from 8 Apr (Free Press Journal).
Open since 13 Aug 2026. VerifiedMMRDA (opens source in a new tab)
MMRDA: Phase IA, 0.29 km with one station, operational from 13 Aug 2026. Services began at 5 pm that day (Free Press Journal).
Not open yet. No opening date announced.
Twenty stations, ESIC Nagar to Mandale. Scroll to ride the line station by station. Distances follow MMRDA's alignment file of March 2025, from ESIC Nagar.
Station 1 of 20
0.00 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 2 of 20
1.14 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 3 of 20
1.69 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 5 of 20
4.39 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 6 of 20
5.38 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 7 of 20
6.43 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 8 of 20
7.56 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Change for Western Railway suburban, BandraReportedoneindia.com (opens source in a new tab)
Under construction Verified
Station 9 of 20
9.68 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Change for Metro Line 3 (Aqua Line)Reportedoneindia.com (opens source in a new tab)
Under construction Verified
Station 10 of 20
11.16 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 11 of 20
11.94 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 12 of 20
13.69 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 13 of 20
15.34 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Change for Central Railway suburban, KurlaReportedoneindia.com (opens source in a new tab)
Under construction Verified
Station 14 of 20
16.37 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 15 of 20
16.93 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Change for Central Railway Harbour line, Chembur (about 200 m),Mumbai Monorail, V N Purav Marg (about 100 m)Reportedbusinesstoday.in (opens source in a new tab)
Open since 13 Aug 2026 VerifiedMMRDA (opens source in a new tab)
Station 16 of 20
17.90 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 17 of 20
18.64 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 18 of 20
19.84 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 19 of 20
21.38 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Change for Central Railway Harbour line, MankhurdReportedoneindia.com (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
Station 20 of 20
22.40 km from the start of the line at ESIC Nagar VerifiedMMRDA (opens source in a new tab)
Open since 7 Apr 2026 VerifiedMMRDA (opens source in a new tab)
A solid line marks track open to riders, Mandale to Chembur; a hollow line marks track under construction.
The line on a street map. Choose a station to see where it sits, what surrounds it and what the street looks like today. The route and stations come from MMRDA's alignment file of March 2025.
Route, MMRDA's alignment file; open from Mandale to ChemburVerifiedMMRDA (opens source in a new tab)
19.05393, 72.89264 (MMRDA's alignment file, Mar 2025)
Choose a station on the map or in the list.
The street view for the chosen station appears here.
Station data last reviewed 30 Oct 2026.
The line in figures. Old figures stay on the page, struck through, so you can see how the project changed.
MMRDA publishes one progress table for Line 2B, updated monthly. It covers the whole line, open stretch included, and does not split it by station or phase.
Every package we could trace, with its value in crore rupees. MMRDA keeps only current notices online, so most of these come from trade press.
| Package | Scope | Floated | Estimate | Awarded | Awarded to | Status | Source |
|---|---|---|---|---|---|---|---|
| CA-04B | Viaduct and stations of the western section, about 12.7 km from D N Nagar towards BKC | Not found | Not published | Not published20 Dec 2017 | Simplex Infrastructures | Cancelled | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-06 | Viaduct and 6 stations, MTNL Metro to Chembur, Kurla Terminus included | Not found | ₹483.05 cr | ₹521.21 cr3 Mar 2018 | RCC Infra Ventures and MBZ (JV) | Cancelled | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-07 | Viaduct and 5 stations, Diamond Garden to Mandale depot | Not found | ₹420.08 cr | Not publishedApr 2019 | NCC | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-14 | Mandale depot, civil works | Not found | Not published | Not published2017 | RCC Infra Ventures and MBZ (JV) | Cancelled | ReportedThe Metro Rail Guy (opens source in a new tab) |
| L2B-C101 | Balance works of CA-04B: 12.824 km of viaduct and 10 stations, ESIC Nagar to ILFS | Not found | ₹1,167.65 cr | ₹1,307.88 cr28 May 2021 | J Kumar Infraprojects | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| L2B-C102 | Balance works of CA-06: 5.868 km of viaduct and 5 stations, MTNL Metro to Chembur | Not found | ₹635.71 cr | Not published6 Apr 2023 | NCC | Awarded | Sources conflictThe Metro Rail Guy (opens source in a new tab) |
| L2B-C103 | Balance civil works of the Mandale depot (CA-14) | Not found | ₹464.75 cr | ₹530.32 crNov 2020 | Ahluwalia Contracts | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-249 | Electrical and mechanical works, five stations from Diamond Garden to Mandale | Feb 2024 | ₹30.04 cr | ₹33.95 crJul 2024 | Colossus Infra Projects | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
All 20, in order from ESIC Nagar, the first station from D N Nagar, to Mandale, then the one an earlier plan had. Names follow MMRDA. Select a station to ride to it, or open its own page.
Station list and order VerifiedMMRDA (opens source in a new tab) station count VerifiedMMRDA (opens source in a new tab)
The latest reported milestones, each linked to the article or document, posts on X picked by hand, and news that a script finds every six hours.
Posts by MMRDA and Maha Mumbai Metro, whose claims count as verified, and by people who follow the project, whose claims count as reported.
Hrishi @Hrishix_
A new I-girder is in place at Juhu Circle. He expects this section to be finished in one to one and a half months, and trial runs possible in six to seven months. Two videos.
Swarup Bodke @bodkeitis
The Shunya bridge over the Vakola nallah in BKC: girders are launched on the Mandale side, but there is no progress over the nallah yet, and the cables are still to be put in. Two photos.
Swarup Bodke @bodkeitis
The curved cantilever bridge over the Mithi river will join soon: only 5 to 10% of the work is left before both ends meet. Two photos.
Swarup Bodke @bodkeitis
Kurla (E) station: finishing work under way, roofing in its last stage. Three photos.
Rajendra B. Aklekar @rajtoday
The girders for Line 2B's crucial curve at the Nehru Nagar signal in Kurla (E) have been assembled. Four photos.
Rajendra B. Aklekar @rajtoday
Work on the crucial curve on SG Barve Marg at the Nehru Nagar signal, Kurla (E), has gathered pace after a building was demolished. Three photos.
Hrishi @Hrishix_
Platform screen doors have started arriving on phase 2, D N Nagar to Saraswat Nagar. Track work is complete past Juhu Circle; overhead wire and signalling work is going on; the roof structure is in place. Juhu Circle should be done in three to four months. Two photos.
Swarup Bodke @bodkeitis
A 64 m girder launched on CST Road, in front of the Kurla depot and Kanakia Zillion. Three photos.
Haldilal @haldilal
MTNL Metro station in BKC. Video.
Swarup Bodke @bodkeitis
A photo of Line 2B works, in a thread of metro photos.
Maha Mumbai Metro @MMMOCL_Official
Chembur station, newly opened, as a multimodal hub for the neighbourhood. Video.
Swarup Bodke @bodkeitis
The pylon of the cable-stayed bridge over the Western Railway is taking shape on the Kalanagar side; temporary supports are in place to set the girders. Two photos.
MMRDA @MMRDAOfficial
Three composite steel girders across the Central Railway between Kurla and Vidyavihar, launched within two weeks over running suburban lines, in short railway blocks. Video.
Arindam Mahapatra @Maha7Arindam
A girder launch for Line 2B near Tilak Nagar station. Quoting his earlier post: work is slow between Kurla (E) and Kurla Metro, where some piers were only recently started, and girders are being cast on site. One photo.
Found automatically in the outlets' own feeds, not checked by a person. Last new item found .
Picked by hand, or found automatically on YouTube and not checked by a person.
From the first report in 2016 to the reported opening target. Dates show only as much precision as the source gives.
Every figure on this page links to where it came from. This is how to read the marks next to them.
The full list, with every news and trade source, is in SOURCES.md.