Chembur metro station
चेंबूर मेट्रो स्थानक
Station 15 of 20 on Mumbai Metro Line 2B, which runs fully elevated from D N Nagar in Andheri through Bandra, BKC, Kurla and Chembur to Mandale. Elevated. Open since 13 Aug 2026.
No ground photo yet
Dated photos of Chembur from the street will appear here.
- Where
19.05393, 72.89264 (MMRDA's alignment file, Mar 2025)
- Along the line
Drawn from MMRDA's alignment file of March 2025, turned so ESIC Nagar is on the left. 16.9 km from the start of the line at ESIC Nagar
- Next stations
- Towards D N Nagar: EEH
- Towards Mandale: Diamond Garden
- Interchange
Central Railway Harbour line, Chembur (about 200 m), Mumbai Monorail, V N Purav Marg (about 100 m)
- Around the station
- Opened on its own on 13 Aug 2026, 0.29 km past Diamond Garden (MMRDA, Phase IA).VerifiedMMRDA (opens source in a new tab)
- Construction
Open since 13 Aug 2026 (Phase IA, Diamond Garden to Chembur)
- Open
Open since 13 Aug 2026, with the rest of Phase IA, Diamond Garden to Chembur. VerifiedMMRDA (opens source in a new tab)
- Name
Chembur
VerifiedMMRDA (opens source in a new tab)
In Marathi: चेंबूर
Facts checked . All 20 stationsThe full Line 2B tracker