MTNL Metro metro station
एम टी एन एल मेट्रो मेट्रो स्थानक
Station 11 of 20 on Mumbai Metro Line 2B, which runs fully elevated from D N Nagar in Andheri through Bandra, BKC, Kurla and Chembur to Mandale. Elevated. Part of Chembur to D N Nagar.
No ground photo yet
Dated photos of MTNL Metro from the street will appear here.
- Where
19.06951, 72.86903 (MMRDA's alignment file, Mar 2025)
- Along the line
Drawn from MMRDA's alignment file of March 2025, turned so ESIC Nagar is on the left. 11.9 km from the start of the line at ESIC Nagar
- Next stations
- Towards D N Nagar: ILFS
- Towards Mandale: SG Barve Marg
- Interchange
None announced
- Construction
Under construction
MMRDA publishes progress for the whole line only (piers 99%, U and I girders 90% as of 31 Aug 2026), not by station. Civil package L2B-C102 (NCC), MTNL Metro to Chembur.
- When it opens
No date has been announced for this station on its own. For Reported in April 2026; no month, the reported target is 2027 to Saraswat Nagar.
- Name
MTNL Metro
VerifiedMMRDA (opens source in a new tab)
In Marathi: एम टी एन एल मेट्रो
Facts checked . All 20 stationsThe full Line 2B tracker