Line 2B

Mumbai Metro, D N Nagar to Mandale. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Mankhurd metro station

मानखुर्द मेट्रो स्थानक

Station 19 of 20 on Mumbai Metro Line 2B, which runs fully elevated from D N Nagar in Andheri through Bandra, BKC, Kurla and Chembur to Mandale. Elevated. Open since 7 Apr 2026.

No ground photo yet

Dated photos of Mankhurd from the street will appear here.

Where

19.04735, 72.93059 (MMRDA's alignment file, Mar 2025)

See it on the mapOpenStreetMap (opens in a new tab)

VerifiedMMRDA (opens source in a new tab)

Along the line
Drawn from MMRDA's alignment file of March 2025, turned so ESIC Nagar is on the left.

21.4 km from the start of the line at ESIC Nagar

Next stations
Interchange

Central Railway Harbour line, Mankhurd

Reportedoneindia.com (opens source in a new tab)

Construction

Open since 7 Apr 2026 (Phase I, Mandale to Diamond Garden)

MMRDA: operational from 7 Apr 2026. The line was inaugurated that day and opened to riders on 8 Apr (Free Press Journal).

VerifiedMMRDA (opens source in a new tab)

Open

Open since 7 Apr 2026, with the rest of Phase I, Mandale to Diamond Garden. VerifiedMMRDA (opens source in a new tab)

Trains run from 6:00 am to 10:30 pm. ReportedFree Press Journal (opens source in a new tab)

A train every 9.5 minutes all day. ReportedFree Press Journal (opens source in a new tab)

A single fare costs ₹10 to ₹20. ReportedFree Press Journal (opens source in a new tab)

Line 2B status and opening date, answered

Name

Mankhurd

VerifiedMMRDA (opens source in a new tab)

In Marathi: मानखुर्द

VerifiedMMRDA (opens source in a new tab)

Facts checked . All 20 stationsThe full Line 2B tracker