Amandoot metro station
अमंडूत (तळोजा) मेट्रो स्थानक
Station 19 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.

- Where
19.07408, 73.08173 (MMRDA's approved alignment, 20 Mar 2025)
See it on the mapOpenStreetMap (opens in a new tab)The drone flight past it, from 12:00
The 2019 project report (DPR) put it 963 m from here.
- Along the line
Drawn from MMRDA's approved alignment of 20 Mar 2025, turned so Kalyan is on the left. 21.8 km from the start of the line at Kalyan (2019 project report: chainage 20,492.296 m)
- Next stations
- Towards Kalyan: Pisarve
- Amandoot is the last station, at the Taloja end.
- Interchange
Navi Mumbai Metro Line 1
- Around the station
- In the 2019 plan: terminal on the right side of Taloja Phase 1 road, reached through the CIDCO metro depot areaVerifiedMMRDA DPR (2019) (opens source in a new tab)
- 75 m steel span at Taloja ROBReportedRail Analysis India (opens source in a new tab)
- Line 12 station piers SP01 to SP05 stand beside Navi Mumbai Metro Line 1's Amandoot station (Aug 2026)Reported@Maha7Arindam on X (opens source in a new tab)
- Construction
Under construction (civil works across the corridor)
MMRDA publishes corridor-wide progress only, not per-station progress.
- When it opens
No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.
Sources conflictFree Press Journal (opens source in a new tab)
- Name
Amandoot (the 2019 project report calls it Taloja)
Called 'Taloja' in the DPR. DPR text gives ch. 20,525.676 m; the station table gives 20,492.296 m. The table value is used.
ReportedThe Metro Rail Guy (opens source in a new tab)
In Marathi: अमंडूत (तळोजा)
More pictures

The station area beside Navi Mumbai Metro Line 1's Amandoot station 
Reinforcement cages for the first pair of piers on the left and right of the line 
Finished piers beside the road, with the Line 1 viaduct on the right 
The reversal area beyond Amandoot, which the photographer reports is complete 
Station piers SP01 and SP02 on temporary steel supports during pier cap casting 
The same station piers from the footpath, during the monsoon 
Formwork for a pier beside the Line 1 station building 
The Line 12 piers beside Line 1's station
Facts checked . All 19 stationsThe full Line 12 tracker