Line 9

Mumbai Metro, Dahisar (E) to Mira-Bhayandar. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Sai Baba Nagar metro station

साई बाबा नगर मेट्रो स्थानक

Station 5 of 8 on Mumbai Metro Line 9, which runs fully elevated from Dahisar (E), at the north end of Line 7, through Mira Road to Bhayandar (W). Elevated. Part of Kashigaon to Subhash Chandra Bose Stadium.

Drone view looking straight down the tracks inside the station's steel roof frame, with the platform slabs on each side
Tracks and platforms inside the station, from aboveDrone still from InfraUnfiltered's video (watch from 2:38), published
Where

19.28437, 72.87104 (MMRDA's alignment file, Mar 2025)

See it on the mapOpenStreetMap (opens in a new tab)The drone flight past it, from 2:28

VerifiedMMRDA (opens source in a new tab)

Along the line
Drawn from MMRDA's alignment file of March 2025, turned so Dahisar (E) is on the left.

4.8 km from the start of the line at Dahisar (E)

Next stations
Interchange

None announced

VerifiedMMRDA (opens source in a new tab)

Checked against the interchange table by Rohan Shanbhag (@rohanshanbhag on X (opens in a new tab)).

Around the station
Construction

Under construction

MMRDA publishes progress for the whole line, not by station (U-girder erection 98% on the viaduct, T-girder erection 97% at the stations, as of 31 Aug 2026). Power on from 29 Jul 2026 (Free Press Journal). Reported for December 2026, after the safety commissioner's inspection. Civil package CA-48 (J Kumar Infraprojects).

VerifiedMMRDA (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Reported in October 2026; no day, the reported target is December 2026.

ReportedConstruction World (opens source in a new tab)

Line 9 status and opening date, answered

Name

Sai Baba Nagar

VerifiedMMRDA (opens source in a new tab)

In Marathi: साई बाबा नगर

VerifiedMMRDA (opens source in a new tab)

Been to Sai Baba Nagar lately? Send us your photos or what you saw. We check every entry and credit you by name.Send a photo or update

Facts checked . All 8 stationsThe full Line 9 tracker