Mumbai Metro, Swami Samarth Nagar to Vikhroli. The unofficial tracker.
All linesEdition of Facts checked Not affiliated with MMRDA
The Pink Line is being built along the Jogeshwari-Vikhroli Link Road, from Andheri to the Eastern Express Highway. On 31 Aug 2026, MMRDA put pier work at about 98 per cent, girders at 93 and stations at 87. Its depot at Kanjurmarg waits for land. 13 stations in all.
VerifiedMMRDA (opens source in a new tab)
Ride the lineThirteen stations, Swami Samarth Nagar to Vikhroli (EEH). Scroll to ride the line station by station. Distances follow MMRDA's alignment file of March 2025, from Swami Samarth Nagar.
Station 1 of 13
0.00 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 2 of 13
0.73 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Change for Metro Line 2A (Dahisar-D N Nagar)VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 3 of 13
1.70 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Change for Western Railway suburban, JogeshwariVerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 4 of 13
2.96 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Change for Metro Line 7 (Dahisar (E)-Andheri (E))VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 5 of 13
3.88 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 6 of 13
5.37 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 7 of 13
6.61 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 8 of 13
7.70 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 9 of 13
8.74 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 10 of 13
9.61 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 11 of 13
10.65 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 12 of 13
12.22 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Change for Metro Line 4 (Wadala-Kasarvadavali),Central Railway suburban, KanjurmargVerifiedMMRDA (opens source in a new tab)
Under construction Verified
Station 13 of 13
13.34 km from the start of the line at Swami Samarth Nagar VerifiedMMRDA (opens source in a new tab)
Under construction Verified
A hollow line marks track under construction. No stretch is open.
The line on a street map. Choose a station to see where it sits, what surrounds it and what the street looks like today. The route and stations come from MMRDA's alignment file of March 2025.
Route, MMRDA's alignment file; under constructionVerifiedMMRDA (opens source in a new tab)
19.11982, 72.90577 (MMRDA's alignment file, Mar 2025)
Choose a station on the map or in the list.
The street view for the chosen station appears here.
Station data last reviewed 30 Oct 2026.
The line in figures. Old figures stay on the page, struck through, so you can see how the project changed.
MMRDA publishes one progress table for Line 6, updated monthly. It covers the whole line, not each station.
Every package we could trace, with its value in crore rupees. MMRDA keeps only current notices online, so most of these come from trade press.
| Package | Scope | Floated | Estimate | Awarded | Awarded to | Status | Source |
|---|---|---|---|---|---|---|---|
| BC-03 | Viaduct and 5 stations, Swami Samarth Nagar to Shyam Nagar, 6.079 km | Not found | Not published | Not publishedAug 2018 | J Kumar Infraprojects | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| BC-02R | Viaduct and 5 stations, Mahakali Caves to Powai Lake (Shyam Nagar to IIT Powai, 4.329 km) | Not found | Not published | ₹372.22 crSep 2018 | MBZ-EIIL JV | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| BC-01R1 | Viaduct and 3 stations, IIT Powai to Vikhroli (EEH), 4.771 km, with the ramp to the depot entry | Not found | Not published | ₹444.98 cr13 Feb 2019 | J Kumar Infraprojects | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-130 (MRS3) | 108 standard gauge cars, with training | 13 Jun 2023 | Not published | None | None | Cancelled | VerifiedMMRDA (opens source in a new tab) |
| CA-209 | Kanjurmarg depot and staff quarters | Not found | ₹508.57 cr | ₹547.45 cr12 Mar 2024 | Sam India Builtwell | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-232 (Systems Package 1) | Trains (18 of 6 cars), CBTC signalling and train control, telecom, platform screen doors, depot machinery, with maintenance | Not found | ₹2,064.63 cr | ₹2,269.66 crJul 2025 | NCC | Awarded | Reportednbmcw.com (opens source in a new tab) |
| CA-233 (Systems Package 2) | Power supply and traction, E&M, lifts and escalators, with maintenance | Not found | Not published | ₹642.44 cr18 Jul 2025 | IRCON International | Awarded | Sources conflictnbmcw.com (opens source in a new tab) |
| CA-264 | Station finishing: IIT Powai, Kanjur Marg (W), Vikhroli (EEH) | Not found | Not published | ₹76.68 cr1 Feb 2025 | SS SS Constructions | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-265 | Station finishing: Mahakali Caves, SEEPZ Village, Saki Vihar Road, Rambaug, Powai Lake | Not found | Not published | ₹124.41 cr1 Feb 2025 | N A Construction | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| CA-266 | Station finishing: Swami Samarth Nagar, Adarsh Nagar, Jogeshwari (W), JVLR, Shyam Nagar, with footbridges at Adarsh Nagar and JVLR | Not found | Not published | ₹165.93 cr1 Feb 2025 | Landmark-Neev JV | Awarded | ReportedThe Metro Rail Guy (opens source in a new tab) |
| MMRDA/TnC/FOB/ML 6/2026 | Foot over bridges at Vikhroli (Part A) and Jogeshwari (Part B) stations | 17 Oct 2026 | Not published | Not yet | Not yet | Open | Verifiedmahatenders.gov.in (opens source in a new tab) |
The trains are ordered. Titagarh Rail Systems is building 18 six-car trains for the whole line. They are part of one contract held by NCC, with the signalling, platform screen doors and depot machinery.
Titagarh Rail SystemsReportedThe Metro Rail Guy (opens source in a new tab)
Package CA-232, held by NCC, ₹2,269.66 crore: 18 trains of 6 cars (108 coaches). ReportedThe Metro Rail Guy (opens source in a new tab)
Maintenance: MMRDA's corrigendum of 30 Sep 2024 names 5 years of comprehensive maintenance after a 2-year defect liability period; its February 2024 notice said 15 years after 2. Sources conflictMMRDA (opens source in a new tab)
Traction, from ABB India: Traction and train control for the 18 trains. Reportedmachinist.in (opens source in a new tab)
MMRDA's published figures. MMRDA's Line 6 page lists width, height and length under rolling stock; it does not say whether the length is one car. Trains and cars per train come from the contract (reported). VerifiedMMRDA (opens source in a new tab)
All 13, in order from Swami Samarth Nagar to Vikhroli (EEH). Names follow MMRDA. Select a station to ride to it, or open its own page.
Station list and order VerifiedMMRDA (opens source in a new tab) station count VerifiedMMRDA (opens source in a new tab)
The latest reported milestones, each linked to the article or document, posts on X picked by hand, and news that a script finds every six hours.
No posts picked yet.
Posts appear here only after a person has checked them.
Found automatically in the outlets' own feeds, not checked by a person. Last new item found .
Nothing found yet.
Headlines about Line 6 appear here when an outlet publishes one.
From the first report in 2016 to the reported opening target. Dates show only as much precision as the source gives.
Every figure on this page links to where it came from. This is how to read the marks next to them.
The full list, with every news and trade source, is in SOURCES.md.
Tell us what is wrong and where you saw the right figure. Corrections are public and dated.
Report a correction on GitHub