Line 6

Mumbai Metro, Swami Samarth Nagar to Vikhroli. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Vikhroli (EEH) metro station

विक्रोळी (ई.ई.एच) मेट्रो स्थानक

Station 13 of 13 on Mumbai Metro Line 6, which runs fully elevated from Swami Samarth Nagar in Andheri along the Jogeshwari-Vikhroli Link Road past SEEPZ and Powai to Vikhroli. Elevated.

No ground photo yet

Dated photos of Vikhroli (EEH) from the street will appear here.

Where

19.12459, 72.93500 (MMRDA's alignment file, Mar 2025)

See it on the mapOpenStreetMap (opens in a new tab)

VerifiedMMRDA (opens source in a new tab)

Along the line
Drawn from MMRDA's alignment file of March 2025, turned so Swami Samarth Nagar is on the left.

13.3 km from the start of the line at Swami Samarth Nagar

Next stations
  • Towards Swami Samarth Nagar: Kanjur Marg (W)
  • Vikhroli (EEH) is the last station.
Interchange

None announced

VerifiedMMRDA (opens source in a new tab)

Around the station
  • The eastern end of the line, at the Eastern Express Highway. MMRDA plans an elevated pit line at this end, so trains can be serviced before the Kanjurmarg depot is built (reported).ReportedFree Press Journal (opens source in a new tab)
Construction

Under construction

MMRDA publishes progress for the whole line only (station works 87.35% as of 31 Aug 2026), not by station. Civil package BC-01R1 (J Kumar Infraprojects), IIT Powai to Vikhroli; station finishing CA-264 (SS SS Constructions) (The Metro Rail Guy).

VerifiedMMRDA (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Line 6 as a whole, the reported target is 2027.

Reportedenglish.lokshahi.com (opens source in a new tab)

Line 6 status and opening date, answered

Name

Vikhroli (EEH)

VerifiedMMRDA (opens source in a new tab)

In Marathi: विक्रोळी (ई.ई.एच)

VerifiedMMRDA (opens source in a new tab)

Facts checked . All 13 stationsThe full Line 6 tracker