Kapurbawdi metro station
Station 1 of 18 on Mumbai Metro Line 5, which will run from Thane through Bhiwandi to Kalyan, with a spur to Ulhasnagar. Elevated. Part of Phase 1, Kapurbawdi to Dhamankar Naka.

- Where
19.22414, 72.97742 (OpenStreetMap, checked on satellite imagery)
See it on the mapOpenStreetMap (opens in a new tab)Street View of the station (opens in a new tab)The drone flight past it, from 12:50
MMRDA's alignment file of March 2025, which puts it on the curve east of Ghodbunder Road, where there is no station put it 758 m from here.
- Along the line
Drawn from MMRDA's alignment file of March 2025 and the tentative key plan of March 2026, turned so Kapurbawdi is on the left. 0.4 km from the start of the line at Kapurbawdi
- Next stations
- Towards Kalyan: Balkum Naka
- Kapurbawdi is the first station, at the Thane end.
- Interchange
Metro Line 4 (Wadala-Kasarvadavali)
VerifiedMMRDA (opens source in a new tab)
Same site as Line 4 Kapurbawdi.
- Construction
Built as part of Metro Line 4; shared by Lines 4 and 5
MMRDA's Phase 1 environmental report (Sep 2023), Table 2.3: Kapurbawdi station is built as part of Metro Line 4 and is not one of Line 5's six Phase 1 stations.
- When it opens
No date has been announced for this station on its own. For Phase 1, Kapurbawdi to Dhamankar Naka, the target is Dec 2026.
- Name
Kapurbawdi
Line 5's first station and its interchange with Line 4. It is built under Line 4's contracts, so MMRDA does not count it among Line 5's stations; the site lists it as Line 5's station 1 (owner's decision, 2026-10-09). Not in the 15-station list on MMRDA's Line 5 page.
VerifiedMMRDA (opens source in a new tab)
Marathi name not yet found in a source.
More from the air

The station, built with Line 4, from above
Facts checked . All 18 stationsThe full Line 5 tracker