Line 4

Mumbai Metro, Wadala to Thane and Gaimukh. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Gowniwada metro station

Station 31 of 32 on Mumbai Metro Line 4, which will run fully elevated from Wadala through Ghatkopar, Mulund and Thane to Kasarvadavali, and on to Gaimukh as Line 4A. Elevated. Part of Phase 1, Gaimukh to Cadbury Junction.

No ground photo yet

Dated photos of Gowniwada from the street will appear here.

Where

19.27669, 72.95803 (MMRDA's alignment file, Mar 2025)

See it on the mapOpenStreetMap (opens in a new tab)

VerifiedMMRDA (opens source in a new tab)

Along the line
Drawn from MMRDA's alignment file of March 2025, turned so Bhakti Park Metro is on the left.

32.9 km from the start of the line at Bhakti Park Metro

Next stations
Interchange

None announced

VerifiedMMRDA (opens source in a new tab)

Around the station
Construction

Built. On the first stretch, Gaimukh to Cadbury Junction; awaiting the CMRS safety report.

Free Press Journal (22 Sep 2025) counts 10 stations on the first stretch, which takes in this one; its report of 22 Aug 2026 names 8 and leaves this station out. No source says why.

Sources conflictFree Press Journal (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Phase 1, Gaimukh to Cadbury Junction, the target is Dec 2026.

ReportedFree Press Journal (opens source in a new tab)

Line 4 status and opening date, answered

Name

Gowniwada

Gowniwada in the Line 4A project report (Oct 2017); 'Gownipada' in MMRDA's alignment file (Mar 2025); 'Govaniwada' in news reports. MMRDA's Line 4 page does not list Line 4A's stations. No Marathi name found in an MMRDA source.

Sources conflictMMRDA DPR, Line 4A (2017) (opens source in a new tab)

Marathi name not yet found in a source.

VerifiedMMRDA (opens source in a new tab)

Facts checked . All 32 stationsThe full Line 4 tracker