Mumbai Metro, West Thane ring. The unofficial tracker.
All linesEdition of Facts checked Not affiliated with MahaMetro
A 29 km ring round west Thane, 20 stations on a viaduct and 2 underground at Thane station and New Thane: 22 in all. The viaduct contract was awarded in December 2025, and piling began in November 2026, as reported. Station contracts are still out to tender.
Reported@Sunny29223375 on X (opens source in a new tab)
Ride the lineThe ring, opened out: 22 stations from Raila Devi round to New Thane, and back to Raila Devi at the right-hand end. Scroll to ride it station by station. Distances follow the centre line on MahaMetro's own route map.
Station 1 of 22
0.00 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Change for Metro Line 4 (Wadala-Kasarvadavali)Reportedhousing.com (opens source in a new tab)
Not started Reported
Station 2 of 22
1.24 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 3 of 22
2.61 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 4 of 22
3.86 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
The route map page lists it as "Shivaji Nagar"; the map file and MahaMetro's design tender (T1-030/DDC-04/2026) call it Shivai Nagar, which the site follows.
Station 5 of 22
5.11 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 6 of 22
5.98 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 7 of 22
7.39 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
The route map page spells it "Natyagraha"; the map file has "Natyagruha", the auditorium's name, which the site follows.
Station 8 of 22
8.14 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 9 of 22
9.98 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Change for Metro Line 4 (Wadala-Kasarvadavali)Reportedhousing.com (opens source in a new tab)
Not started Reported
Station 10 of 22
10.73 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
The route map page writes "Vijaynagari"; the map file and the station tender write Vijay Nagari.
Station 11 of 22
11.97 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 12 of 22
13.04 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 13 of 22
15.10 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 14 of 22
15.94 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 15 of 22
16.98 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
The route map page and map file write "Manorma Nagar"; MahaMetro's design tender (T1-031/DDC-05/2026) writes Manorama Nagar, the locality's usual spelling, which the site follows.
Station 16 of 22
18.31 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 17 of 22
19.49 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Change for Metro Line 5 (Thane-Bhiwandi-Kalyan)Reportedhousing.com (opens source in a new tab)
Not started Reported
Station 18 of 22
20.47 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
MahaMetro's design tender writes "Balkum Pada".
Station 19 of 22
21.37 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 20 of 22
22.25 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Not started Reported
Station 21 of 22
24.22 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Change for Central Railway (Thane)VerifiedThane Ring Metro (official) (opens source in a new tab)
Underground station
Not started Reported
Station 22 of 22
25.78 km round the ring from Raila Devi VerifiedThane Ring Metro (official) (opens source in a new tab)
Underground station
Not started Reported
A hollow line marks track not yet built; a dashed line marks the underground stretch. The ring is drawn opened out: both ends are Raila Devi.
The ring on a street map. Choose a station to see where it sits, what surrounds it and what the street looks like today. The route and stations come from the map on MahaMetro's Thane Metro website.
Route, MahaMetro's route map; not yet builtVerifiedThane Ring Metro (official) (opens source in a new tab)
Underground stretch: 3.0 km, measured back from the ramp on MahaMetro's map
19.18681, 72.97671 (MahaMetro's route map file, 2026)
Choose a station on the map or in the list.
The street view for the chosen station appears here.
Station data last reviewed 3 Nov 2026.
The line in figures. Old figures stay on the page, struck through, so you can see how the project changed.
MahaMetro publishes no progress table for the ring line; its website's project update page reads 'Data Not Available'.
About 3,200 trees are to be removed, with permissions under way; residents objected to the route near Manorama Nagar and Azad Nagar. MahaMetro plans to plant 37,000 trees and says route changes will rest on feasibility, cost and public interest.
Free Press Journal (15 Apr 2026): the Thane Municipal Corporation sanctioned the felling of 3,000 trees. Hiranandani residents' feedback on station planning is being evaluated (16 Oct 2026).
ReportedFree Press Journal (opens source in a new tab)Also: Free Press Journal
Every package we could trace, with its value in crore rupees. MahaMetro lists its notices and awards on its Thane Metro website; the viaduct contract and the bidders come from trade press and posts on X.
| Package | Scope | Floated | Estimate | Awarded | Awarded to | Status | Source |
|---|---|---|---|---|---|---|---|
| C-01 | Elevated viaduct, 20.527 km from the end of the underground ramp to Balkum Naka, with the depot approach and three special spans | Not found | ₹1,424 cr | ₹1,415 cr10 Dec 2025 | HG Infra Engineering and Kalpataru Projects JV | Awarded | ReportedMetro Rail Today (opens source in a new tab) |
| T1-023/C-02/2025 | Construction of six elevated stations: Manpada, Dongripada, Vijay Nagari, Waghbil, Waterfront and Patlipada | 25 Nov 2025 | ₹223.7 cr | Not yet | Not yet | Bids opened | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| DDC-01 | Detailed design of six elevated stations: Dr. Kashinath Ghanekar Natyagruha, Manpada, Dongripada, Vijay Nagari, Waghbil and Waterfront | Not found | Not published | Not found | Not found | Unknown | ReportedFree Press Journal (opens source in a new tab) |
| T1-024/DDC-03/2025 | Detailed design of the two underground stations, Thane Junction and New Thane: architecture, tunnel ventilation, environmental control, building management, E&M (about 3.0 km with ramps) | 12 Dec 2025 | Not published | Not found | Not found | Unknown | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1-038/DDC-06/2026 | Detailed design and proof checking of the two underground stations, Thane Junction and New Thane, and the tunnel (about 3.0 km with ramps) | 5 Aug 2026 | Not published | Not yet | Not yet | Open | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1-030/DDC-04/2026 | Detailed design of six elevated stations: Raila Devi, Wagle Circle, Lokmanya Nagar Bus Depot, Shivai Nagar, Neelkanth Terminal and Gandhi Nagar | 1 Apr 2026 | Not published | Not yet | Not yet | Bids opened | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1-031/DDC-05/2026 | Detailed design of seven elevated stations: Azad Nagar Bus Stop, Manorama Nagar, Kolshet Industrial Area, Balkum Naka, Balkum Pada, Rabodi and Shivaji Chowk | 1 Apr 2026 | Not published | Not yet | Not yet | Bids opened | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1-019/Consul-05/2025 | General consultants for the project | 22 Sep 2025 | Not published | ₹179.85 crJul 2026 | AECOM India and Nippon Koei India consortium | Awarded | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1PD-02/2026 | Transit oriented development plan, local area master plan and multi-modal integration plan | 11 Feb 2026 | Not published | Not published | Techcomm Urban Management Consultants and Service Providers | Awarded | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1-018/RS-01/2025 and T1-025/RS-02/2026 | Consultant to review the driverless (UTO) trains and systems, shared with Pune Metro Line 4 | 23 Sep 2025 | Not published | Not found | Not found | Unknown | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1-016/ELE-01/2025, T1-022/ELE-02/2025, T1-035/Ele-03/2026 | Shifting and raising high-voltage power lines that cross the route: near Patlipada flyover (ch. 11,350 m), near Waghbil and the Kasarvadavali depot (ch. 14,050 m), between Balkum Naka and Balkum Pada (ch. 20,950 m), and others | 2025 | Not published | Not found | Not found | Unknown | VerifiedThane Ring Metro (official) (opens source in a new tab) |
| T1-037/ADM-03/2026 | Public relations agency for the project | 30 Jun 2026 | Not published | Not yet | Not yet | Open | VerifiedThane Ring Metro (official) (opens source in a new tab) |
All 22, round the ring in MahaMetro's order, from Raila Devi to New Thane; after New Thane the line runs back to Raila Devi. Select a station to ride to it, or open its own page.
Station list and order VerifiedThane Ring Metro (official) (opens source in a new tab) station count Verifiedpib.gov.in (opens source in a new tab)
The latest reported milestones, each linked to the article or document, posts on X picked by hand, and news that a script finds every six hours.
Posts by people who follow the project, not by MahaMetro. Their claims count as reported.
Sunny @Sunny29223375
Piling has officially begun on the Thane Integral Ring Metro, with photos (credited to Kota Ganesh).
Swarup Bodke @bodkeitis
Soil testing has reached Raila Devi, where phase 1 starts; it is the last stage of soil testing. With photos.
Swarup Bodke @bodkeitis
MahaMetro has invited bids for the detailed design of the underground section: architecture and E&M, tunnel ventilation with fire and airflow simulations, environmental control and building management.
Swarup Bodke @bodkeitis
The Environment Ministry has given the project its Coastal Regulation Zone (CRZ) clearance.
Sunny @Sunny29223375
Only two firms bid for the detailed design of 12 elevated stations: STUP Consultants and SYSTRA MVA Consulting (India).
Artful Dodger @RahulChels
MahaMetro invited bids for a design consultant for the two underground stations: Thane Junction at Thane suburban station, and New Thane at the Kopri bridge.
Found automatically in the outlets' own feeds, not checked by a person. Last new item found .
From the first report in 2024 to the reported opening target. Dates show only as much precision as the source gives.
Every figure on this page links to where it came from. This is how to read the marks next to them.
The full list, with every news and trade source, is in SOURCES.md.
Tell us what is wrong and where you saw the right figure. Corrections are public and dated.
Report a correction on GitHub