Line 5

Mumbai Metro, Thane to Kalyan. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Temghar metro station

टेमघर मेट्रो स्थानक

Station 9 of 18 on Mumbai Metro Line 5, which will run from Thane through Bhiwandi to Kalyan, with a spur to Ulhasnagar. Elevated. Part of Phase 2, Dhamankar Naka to Durgadi.

No ground photo yet

Dated photos of Temghar from the street will appear here.

Where

19.28169, 73.07413 (MMRDA's alignment file, Mar 2025)

See it on the mapOpenStreetMap (opens in a new tab)

VerifiedMMRDA (opens source in a new tab)

Along the line
Drawn from MMRDA's alignment file of March 2025 and the tentative key plan of March 2026, turned so Kapurbawdi is on the left.

16.2 km from the start of the line at Kapurbawdi

Next stations
Interchange

None announced

VerifiedMMRDA (opens source in a new tab)

Construction

Not started

Free Press Journal (7 Sep 2026), reporting MMRDA: work beyond Bhiwandi, towards Kalyan, has not begun.

ReportedFree Press Journal (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Phases 2 and 3 towards Kalyan, and the Line 5A spur to Ulhasnagar, the reported target is 2030-31.

ReportedMetro Rail News (opens source in a new tab)

Line 5 status and opening date, answered

Name

Temghar

VerifiedMMRDA (opens source in a new tab)

In Marathi: टेमघर

VerifiedMMRDA (opens source in a new tab)

Facts checked . All 18 stationsThe full Line 5 tracker