Line 5

Mumbai Metro, Thane to Kalyan. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Bhoirwadi metro station

Station 16 of 18 on Mumbai Metro Line 5, which will run from Thane through Bhiwandi to Kalyan, with a spur to Ulhasnagar. Elevated. Part of Phase 3 and the Line 5A spur, Durgadi to Kalyan and Ulhasnagar.

No ground photo yet

Dated photos of Bhoirwadi from the street will appear here.

Where

19.24767, 73.14520 (tentative key plan, MMRDA tender, Mar 2026)

See it on the mapOpenStreetMap (opens in a new tab)

Reported@Maha7Arindam on X (opens source in a new tab)

Along the line
Drawn from MMRDA's alignment file of March 2025 and the tentative key plan of March 2026, turned so Kapurbawdi is on the left.

25.9 km from the start of the line at Kapurbawdi

Next stations
Interchange

None announced

VerifiedMMRDA (opens source in a new tab)

Construction

Not started

Reported@Maha7Arindam on X (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Phases 2 and 3 towards Kalyan, and the Line 5A spur to Ulhasnagar, the reported target is 2030-31.

ReportedMetro Rail News (opens source in a new tab)

Line 5 status and opening date, answered

Name

Bhoirwadi

VerifiedMMRDA (opens source in a new tab)

Marathi name not yet found in a source.

VerifiedMMRDA (opens source in a new tab)

Facts checked . All 18 stationsThe full Line 5 tracker