Line 4

Mumbai Metro, Wadala to Thane and Gaimukh. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Anik Nagar Bus Depot metro station

अनिकनगर बसडेपो मेट्रो स्थानक

Station 3 of 32 on Mumbai Metro Line 4, which will run fully elevated from Wadala through Ghatkopar, Mulund and Thane to Kasarvadavali, and on to Gaimukh as Line 4A. Elevated. Part of Phase 3, Gandhi Nagar to Wadala.

No ground photo yet

Dated photos of Anik Nagar Bus Depot from the street will appear here.

Where

19.04673, 72.87839 (MMRDA's alignment file, Mar 2025)

See it on the mapOpenStreetMap (opens in a new tab)

VerifiedMMRDA (opens source in a new tab)

Along the line
Drawn from MMRDA's alignment file of March 2025, turned so Bhakti Park Metro is on the left.

1.9 km from the start of the line at Bhakti Park Metro

Next stations
Interchange

None announced

VerifiedMMRDA (opens source in a new tab)

Planned: Metro Line 11 (Wadala-Gateway of India), proposed.

The Metro Rail Guy (Sep 2025) lists Anik Bus Depot as Line 11's first station. No MMRDA page for Line 11 was found (the URL returns 404).

ReportedThe Metro Rail Guy (opens source in a new tab)

Construction

Under construction

MMRDA publishes progress for the whole line only (pier work 95%, U-girders 94%, deck slab 92% as of 31 Aug 2026), not by station.

VerifiedMMRDA (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Targets reported in September 2025; the first has passed, the reported target is October 2026 to Gandhi Nagar, October 2027 to Wadala.

ReportedFree Press Journal (opens source in a new tab)

Line 4 status and opening date, answered

Name

Anik Nagar Bus Depot

VerifiedMMRDA (opens source in a new tab)

In Marathi: अनिकनगर बसडेपो

VerifiedMMRDA (opens source in a new tab)

Facts checked . All 32 stationsThe full Line 4 tracker