Kalyan Phata metro station
कल्याण फाटा मेट्रो स्थानक
Station 6 of 12 on Mumbai Metro Line 12A, which will run fully elevated from Manpada along Kalyan-Shilphata Road to Kalyan Phata, then towards Taloja to join Line 12 near Khutari. Elevated. Planned. Not started.
No ground photo yet
Dated photos of Kalyan Phata from the street will appear here.
- Where
19.14292, 73.04680 (indicative: the named place in OpenStreetMap, on the road)
- Along the line
Drawn from OpenStreetMap roads through the named places, an indicative route; MMRDA has published none, turned so Manpada is on the left. 7.0 km from the start of the line at Manpada
- Next stations
- Towards Manpada: Padle Gaon
- Towards Khutari: Gotheghar Gaon
- Interchange
None announced
- Construction
Not started
Approved by the state Cabinet Infrastructure Committee on 27 Oct 2026. No contract has been awarded.
- When it opens
No date has been announced for this station on its own. For Line 12A as a whole, the reported target is Apr 2030.
- Name
Kalyan Phata
Shilphata junction. Financial Express (PTI) reports an interchange with Line 14 between Katai Naka and Kalyan Phata.
Reportedloksatta.com (opens source in a new tab)
In Marathi: कल्याण फाटा
Facts checked . All 12 stationsThe full Line 12A tracker