Vadavli (Khu.) metro station
वडवली (खु.) मेट्रो स्थानक
Station 13 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.
No ground photo yet
Dated photos of Vadavli (Khu.) from the street will appear here.
- Where
19.14542, 73.09390 (MMRDA's approved alignment, 20 Mar 2025)
- Along the line
Drawn from MMRDA's approved alignment of 20 Mar 2025, turned so Kalyan is on the left. 13.1 km from the start of the line at Kalyan (2019 project report: chainage 12,553.4 m)
- Next stations
- Towards Kalyan: Nilje Gaon
- Towards Taloja: Bale
- Interchange
None announced
- Around the station
- In the 2019 project report: in Vadavli Khurd villageVerifiedMMRDA DPR (2019) (opens source in a new tab)
- Construction
Under construction (civil works across the corridor)
MMRDA publishes corridor-wide progress only, not per-station progress.
- When it opens
No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.
Sources conflictFree Press Journal (opens source in a new tab)
- Name
Vadavli (Khu.)
MMRDA spells it Wadavli. The depot reportedly connects via this station (Free Press Journal, Dec 2024).
ReportedThe Metro Rail Guy (opens source in a new tab)
In Marathi: वडवली (खु.)
Facts checked . All 19 stationsThe full Line 12 tracker