Kolegaon metro station
कोळेगाव मेट्रो स्थानक
Station 11 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.
No ground photo yet
Dated photos of Kolegaon from the street will appear here.
- Where
19.16499, 73.09496 (MMRDA's approved alignment, 20 Mar 2025)
- Along the line
Drawn from MMRDA's approved alignment of 20 Mar 2025, turned so Kalyan is on the left. 10.8 km from the start of the line at Kalyan (2019 project report: chainage 9,978.357 m)
- Next stations
- Towards Kalyan: Hedutane
- Towards Taloja: Nilje Gaon
- Interchange
None announced
- Around the station
- In the 2019 project report: in Hedutane village areaVerifiedMMRDA DPR (2019) (opens source in a new tab)
- 100 m span near Kolegaon over the Virar-Alibaug Multimodal CorridorReportedRail Analysis India (opens source in a new tab)
- Construction
Under construction (civil works across the corridor)
MMRDA publishes corridor-wide progress only, not per-station progress.
- When it opens
No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.
Sources conflictFree Press Journal (opens source in a new tab)
- Name
Kolegaon
ReportedThe Metro Rail Guy (opens source in a new tab)
In Marathi: कोळेगाव
Facts checked . All 19 stationsThe full Line 12 tracker