Line 12

Mumbai Metro, Kalyan to Taloja. The unofficial tracker.

All linesEdition of Facts checked Not affiliated with MMRDA

Ganesh Nagar metro station

गणेश नगर मेट्रो स्थानक

Station 3 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.

Drone view of the Line 12 piers and viaduct along the road beside a shopping mall, with dense housing on the other side
The station site beside the mall, from aboveDrone still from InfraUnfiltered's video (watch from 4:36), published
Where

19.22942, 73.12207 (MMRDA's approved alignment, 20 Mar 2025)

See it on the mapOpenStreetMap (opens in a new tab)The drone flight past it, from 4:30

VerifiedMMRDA (opens source in a new tab)

Along the line
Drawn from MMRDA's approved alignment of 20 Mar 2025, turned so Kalyan is on the left.

1.7 km from the start of the line at Kalyan (2019 project report: chainage 843.771 m)

Next stations
Interchange

None announced

VerifiedMMRDA (opens source in a new tab)

Around the station
  • In the 2019 project report: on the median of Kalyan-Shilphata Road; the alignment then turns at Sambhaji Maharaj Chowk (about ch. 1,087 m) and crosses Shree Ram Chowk (about ch. 1,560 m)VerifiedMMRDA DPR (2019) (opens source in a new tab)
Construction

Under construction (civil works across the corridor)

MMRDA publishes corridor-wide progress only, not per-station progress.

ReportedMMRDA (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.

Sources conflictFree Press Journal (opens source in a new tab)

Line 12 status and opening date, answered

Name

Ganesh Nagar

ReportedThe Metro Rail Guy (opens source in a new tab)

In Marathi: गणेश नगर

Reportedloksatta.com (opens source in a new tab)

Facts checked . All 19 stationsThe full Line 12 tracker